Port Works
- 2018-Current
- HONG KONG HANG TONG CO., LTD.Hong Kong International Airport Three Runway Project C3206
Sloping seawall & vertical seawall construction
- 2018-Current
- BUILD KING-SCT JOINT VENTURECivil Eng. and Development Department NL/2017/03
Tung Chung New Town Extension Reclamation and Advance Works Sand Reclamation / Geotextile / Silt Curtain / Perimeter Mould
- 2017-Current
- LEIGHTON-CHINA STATE JVMTR Corporation Ltd. SCL1123
Exhibition Station and Western Approach Tunnel Receiving, Sorting, Handling, Loading for Marine Disposal of C&D Materials to the Legal Receipting Sites
- 2017-Current
- CHINA HARBOUR-ZHEN HUA JVCivil Eng. and Development Department CV/2015/07
Handling of Surplus Public Fill (2016-2018) Collection and Delivery of Public Fill Between Public Fill Reception Facilities
- 2017-2017
- BACHY SOLETANCHE-SAMBO JVHong Kong International Airport C3205
Installation of Silt Curtain and Barge Modification
- 2015-2016
- PENTA-OCEAN-CHINA STATE JVC1121 NSL Cross Harbour Tunnels
Crane Barge for lifting materials under HUH bypass
- 2014-Current
- DRAGAGES-BOUYGUES JVMTR Corporation Ltd. SCL1128
South Ventilation Building to Admiralty Tunnels Supply, Fabrication and Installation of Silt Curtain at Works Area W1
Removal of Reclamation at Works Area W1
- 2014-2018
- DRAGAGES-BOUYGUES JVHighways Department HY/2012/08
Tuen Mun Chek Lap Kok Link-Northern Connection Sub-Sea Tunnel Section Supply and Delivery of Rockfill Material by Marine to Tuen Mun
Marine Plant for Setup of South Ventilation Shaft
- 2013-2013
- CHINA HARBOUR ENG. CO. LTD.Hong Kong International Airport P547
Midfield Parking Stands Earthwork – Disposal of Materials by Marine Transport
- 2012-2016
- DRAGAGES-CHINA HABROUR-VSL JVHighways Department HY/2011/09
Hong Kong-Zhuhai-Macau Bridge Hong Kong Link Road Section between HKSAR Boundary and Scenic Hill Marine Deposit Disposal
Pile Cap Construction Works for Marine Viaduct Package A
Construction of In-situ Columns for Marine Viaduct
Construction of In-situ Columns at Pier P0 for Marine Viaduct
Construction of Turnaround Facility In-situ Column for Marine Duct
- 2012-2015
- NISHIMATSU CONSTRUCTION CO., LTD.MTR Corporation Ltd. SIL902
Nam Fung Tunnel and Ventilation Buildings Reinstatement for Telegraph Bay Works Area
- 2011-2018
- LAING O'ROURKE-HSIN CHONG-PAUL Y JVMTR Corporation Ltd. XRL810B
West Kowloon Terminus Station Barge Management & Disposal to Mainland China
ELS at Sea Water Intake and Outfall Culvert
Sea Wall Modification Works
Sea Wall Break Through & Modification at SWIC
- 2011-2013
- BACHY SOLETANCHE GROUP LTD.Highways Department HY/2009/15
Central Wanchai Bypass Tunnel Diaphragm wall & barrette construction and marine disposal to TM38
- 2010-2017
- GAMMON-LEIGHTON JVMTR Corporation Ltd. XRL811B
West Kowloon Terminus Approach Tunnel (South) Barging Facilities at Nam Cheong Guay
Operation of Barging Facility and transportation to Mainland China
Initial hoarding barging facility at Nam Cheong Guay
Disposal of Fill Material
- 2010-2016
- DRAGAGES-BOUYGUES JVMTR Corporation Ltd. XRL820
Mei Lai Road to Hoi Ting Road Tunnels Disposal of Spoil Excavated from TBM Tunnels to China by Marine
Land Transportation and Marine Disposal of Rock from Main Tunnel
Supply and Delivery of Sands for Mortar Production
Seabed Level Adjustment along the Seawall Adjacent to 820 Cheung Sha Wan Barging Point
- 2010-2015
- DRAGAGES-BOUYGUES JVMTR Corporation Ltd. XRL821
Shek Yam to Mei Lai Road Tunnels Disposal of Tunnel Spoil to Mainland China by Marine
Site Establishment Works
- 2008-2013
- DRAGAGES-NISHIMATSU JVDrainage Services Department DC/2007/10
Design and Construction of Hong Kong West Drainage Tunnel Carrying out Temporary Marine Works at Western Portal including construction of seawall block
Marine Transportation of Surplus to Mainland China